Linked In YouTube

Parallel Seismic (PS) - Determine the length of buried piles and foundations

Olson Parallel Seismic NDT Pile Test system in the fieldIntroduction

The Parallel Seismic (PS) method is an NDT pile testing and is applied to determine the lengths of deep foundations where foundation tops are not accessible, or when the piles are too long and slender (such as H piles or driven piles) to be tested by Impact Echo, Pile Integrity Testing, Sonic Echo/Impulse Response techniques. In addition, the PS method can provide information about the soil below the foundation bottom for geotechnical testing.

Applications

The PS investigation can be performed on foundations or piles made of:

  • Concrete
  • Wood
  • Masonry
  • Steel

Soil quality below the foundation can also be determined by the PS test.

How it works

Schematic showing the test layout for Parallel Seismic testing of pilesParallel Seismic involves hitting any part of the structure that is connected to the pile or foundation (or hitting the foundation itself, if accessible) and receiving compressional and/or shear waves travelling down the foundation by a hydrophone or a geophone receiver.

In PS pile testing, one relies on identifying direct arrival times of compressional and shear waves at the receiver locations, as well as the wave amplitudes.

The PS investigation is performed at 30-60cm vertical receiver intervals in the borehole. The field setup for PS investigations is shown in Figure 1.

Access

Some portion of the structure that is connected to the foundation must be exposed for the hammer impacts. A borehole is required. Typically a 5-10 centimetre diameter hole is drilled as close as possible to the foundation (within 1.5 meters preferred).

The borehole should extend at least 3 to 4.5 meters below the expected bottom of the foundation. In case of hydrophone use, the hole must be cased, capped at the bottom and the casing and hole filled with water. For geophone use, the hole must usually be cased and grouted to prevent the soil from caving in during testing.

Processing Techniques

Some geophysical processing techniques can be used to help optimise the Parallel Seismic data. These techniques include Auto Gain Control (AGC) and filtering to enhance weak events. IX Foundation, a seismic analysis and display program, allows the full range of data to be viewed at one time. This improves the ability to identify the bottom of the foundation being investigated.

  • Image of the sensors, controller and cables for Parallel SeismicOlson Freedom Data PC
  • Impulse hammer
  • Hydrophone
  • Reel of cable

Interpretation of Data

The use of seismic analysis software, such as IX Foundation, allows for determination of approximate pile length easily. The diffraction, or change in slope, that occurs in the data as a result of the pile tip acting as a point diffractor and a reflector is shown in Figure 1. The software is capable of determining velocity based on the slope of the line and where the two lines of the differing slopes intersect a depth is determined.

Parallel Seismic data shown in the IX software showing the length of a buried pile

Figure 2 The figure to the left shows PS results from tests performed on a concrete pile in saturated soils. The bottom of the concrete pile is identified at 14.3m where the compressional wave velocity changes from 4287 m/sec (velocity of concrete) to a velocity of 1773 m/sec (velocity of water).

Effectiveness

The PS NDT pile test method is more accurate and more versatile than other non-destructive surface techniques for determination of unknown foundation depths.  The accuracy of the method depends on the variability of the velocity of the surrounding soil and the spacing between the borehole and the foundation element.

Depths are normally determined to within 5% accuracy or better. A borehole is typically needed for Parallel Seismic tests, which adds to the cost of the investigation (unless borings are also needed for other geotechnical testing purposes).

The borehole should be within 1.5m of the foundation, which sometimes cannot be achieved due to field constraints. Note that for very uniform soils (such as saturated sands), a successful test can be performed with up to 4.5-6m spacing between the source and the borehole.

As the borehole moves away from the foundation, interpretation of the PS data becomes more difficult and the uncertainty in the tip depth determination becomes greater.

Platforms Available

We offer two devices available for the PS technique. These include the NDE360 and DataPC. These offer differing levels of mobility and on-site analysis.  Please see the individual brochures for more in depth specifications for the platforms.

VIC:

Melanie Lasslett

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

M: 0428 315 502

Gary Day

E: This email address is being protected from spambots. You need JavaScript enabled to view it. 

M: 0488 331 244

QLD:

Michael Dubery

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

T: (07) 3040 6166

M: 0419 477 715

NZ:

NZ Sales

T: +64 9 377 6778

E: This email address is being protected from spambots. You need JavaScript enabled to view it. 

M: +64 274 738 758

WA:

(Head Office)

T: (08) 9322 4020

Derek Burns

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

M: 0498 800 373

Reuben Barnes

E: rThis email address is being protected from spambots. You need JavaScript enabled to view it.

M: 0408 034 668

NSW:

T: (02) 9453 9999

William Ward

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

M: 0418 381 709

Joel Shenoy

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

M: 0487 043 466

Warehouse / Service Centre

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

E: This email address is being protected from spambots. You need JavaScript enabled to view it.

T: (02) 9453 9941

Linked In YouTube